Thanks Dave, I will of cause post every progress here.
Currently again waiting for some parts to get the Battery mount done.
Also waiting on 4AWG Cables and additional QS10 Connectors to get the Leads from Battery to Fuse to Batteryswitch to Controller to the correct length.
(little sidenote it was quiet a hassle to solder that large cables to a QS10 Connector when I was shortening the too long ordered Battery Cables)
It needed some extra heat usually I solder everything with 300 degree celsius but this time I had to go up to 450 degrees as there is such a large metal surface you need to heat up and I had to use a ton of solder xD
but now the cable is in a managable length
I have actually planned to do a California round Trip in a RV tackling all the typical tourist spots with Wife and Kid within the next 2 years.
Currently again waiting for some parts to get the Battery mount done.
Also waiting on 4AWG Cables and additional QS10 Connectors to get the Leads from Battery to Fuse to Batteryswitch to Controller to the correct length.
(little sidenote it was quiet a hassle to solder that large cables to a QS10 Connector when I was shortening the too long ordered Battery Cables)
It needed some extra heat usually I solder everything with 300 degree celsius but this time I had to go up to 450 degrees as there is such a large metal surface you need to heat up and I had to use a ton of solder xD
but now the cable is in a managable length
I have actually planned to do a California round Trip in a RV tackling all the typical tourist spots with Wife and Kid within the next 2 years.